PV System Inspector (PVSI) Exam Prep
Free practice questions

Free PVSI Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The PVSI exam has 45 questions and runs 2 hours.

These 10 free PVSI questions are organized by exam domain, so you can see how each part of the PV System Inspector (PVSI) blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Inspecting Electrical Components and Systems 44% of exam

Question 1

A dwelling's rooftop array is tested under the 2017 NEC rapid-shutdown provisions, including the inside-array voltage-limiting method effective in 2019. At 25 seconds after initiation, the highest readings are 24 V outside the array boundary and 68 V inside it. These are the maxima across all required conductor-to-conductor and conductor-to-ground measurements, and they remain stable. How should these results be interpreted?

Show answer & explanation

Correct answer: B - Both locations satisfy their applicable rapid-shutdown voltage and time limits.

Question 2

A panelboard has a 200 A bus and a 175 A main breaker at its upper end. A proposed inverter has a maximum continuous AC output of 48 A and a 60 A source breaker at the opposite end. The bus contains loads, the required source-location warning will be installed, and no other source is connected. Which calculation correctly evaluates the busbar limit under the 2017 NEC opposite-end 120% method?

Show answer & explanation

Correct answer: C - 175 A + (1.25 × 48 A) = 235 A, which is below 120% of the 200 A bus rating and passes.

Question 3

A qualified thermographer examines a commercial inverter's three AC phase terminations under steady load. One lug measures 82°C; the other two measure 44°C and 45°C. Temperature drops rapidly along the conductor away from the hot lug. Phase currents are equal and within ratings. Conductor sizing, ambient conditions, and measurement emissivity have been checked. Which condition best fits this pattern?

Show answer & explanation

Correct answer: A - Excessive contact resistance at the conductor-to-lug interface.

Question 4

Three identical PV strings feed a combiner output circuit. Each string has a module-rated short-circuit current of 9.2 A. The circuit has 75°C terminals and 90°C-insulated copper conductors. The applicable combined ampacity correction and adjustment factor is 0.58. Copper table ampacities at 75°C/90°C are: 10 AWG, 35/40 A; 8 AWG, 50/55 A; 6 AWG, 65/75 A; and 4 AWG, 85/95 A. No alternative engineered-current calculation or 100%-rated assembly exception applies. Which is the smallest conductor that satisfies both 2017 NEC 690.8 ampacity checks?

Show answer & explanation

Correct answer: C - 6 AWG copper

Domain 2: Inspecting Energy Storage Components and Systems 21% of exam

Question 5

An MPPT charge controller receives 96 V at 12 A from an array and delivers 54 V at 20 A toward a battery bank during steady charging. Independent measurements confirm the current directions and values. No other charger is connected, and all readings are within the equipment's operating limits. What explains the higher battery-side current?

Show answer & explanation

Correct answer: A - DC-to-DC conversion reduces voltage while increasing the available charging current.

Question 6

An installer proposes placing valve-regulated AGM batteries in a sealed, unventilated cabinet, arguing that the batteries recombine charging gases and are labeled 'sealed.' Which fact prevents that label alone from establishing the cabinet's suitability?

Show answer & explanation

Correct answer: D - AGM batteries can vent gas; applicable ventilation requirements still must be met.

Domain 3: Inspecting Mechanical/Structural Components and Systems 21% of exam

Question 7

The total ballast on a commercial rooftop array matches the approved design. However, the design calls for 60 lb in each corner tray and 30 lb in each interior tray, while one corner tray contains 30 lb and one interior tray contains 60 lb. The contractor argues that the unchanged total weight makes the arrangement equivalent. The installation should be brought into conformance by:

Show answer & explanation

Correct answer: D - Restoring both tray weights to their locations in the approved ballast schedule.

Question 8

An inspection photograph shows a PV roof mount with its metal flashing laid over the uphill asphalt shingles. A continuous bead of sealant covers the flashing's exposed upslope edge, and the roof deck is dry. The mount manufacturer's detail requires shingle-lapped flashing. Which correction addresses the water-shedding defect?

Show answer & explanation

Correct answer: D - Reinstall the flashing with its upslope edge beneath the uphill shingle course.

Domain 4: Documentation for the System Inspection 14% of exam

Question 9

A permit reviewer must establish the longest permissible series string for an inverter with a 600 V absolute DC-input limit and a 250-550 V MPPT operating range. Each module has Voc = 41.0 V at 25°C and a Voc temperature coefficient of −0.30%/°C. The accepted minimum design temperature for the Voc calculation is −10°C. Calculated module Vmp ranges from 28.0 V at the hot design condition to 38.0 V at the cold condition. Manufacturer instructions require use of the temperature coefficient; all other input limits are satisfied. What is the largest permissible number of modules in one string?

Show answer & explanation

Correct answer: B - 13 modules

Question 10

Choose the report entry that accurately describes this finding: The permit equipment schedule identifies one inverter model, but a different model is installed. Its listing, electrical ratings, protective functions, and required clearances have been verified as compliant. The substitution has not been approved through the local permit process.

Show answer & explanation

Correct answer: B - Unresolved design deviation: the installed model lacks approval as a permit substitution.

That's 10 of 1,030

The full bank has 1,020 more PVSI questions with explanations.

Continue in the free practice test →

View plans